Field Engineering Management is covered in the Project Execution phase.

Field Engineering can have direct leadership within the onsite team and functional leadership to the Discipline Engineering Lead.

Field Engineering ensures the engineering meets the requirements of the Construction team in a timely manner. Field Engineering can assist directly or engage the off-site engineering team for assistance.

Refer to Engineering Management Planning for works covered during the Project Planning phase.

Services

We are specialist in the provision of Project Data Integration (PDI) and Project Execution Planning (PEP).

Click below to learn more about the services we provide and how we can help to make your project a success.

Register Development

We develop and maintain all your project registers to ensure the highest level of accuracy, and in accordance with database principals.

Progress Measurement

Our PDI Forecasting software allows for instant update of your registers to fully functional, industry leading progress measurement tool with minimal input requirement.

Project Forecasting

Our PDI Forecasting software provides industry leading resource forecasting with minimal input requirements and setup times.

Project Reporting

Our PDI Forecasting software provides instant project reporting with endless variability for repeatable results and 100% accuracy.

Look-ahead Programming

Our PDI Forecasting software provides look-ahead programming and contract programme interface functionality to accurately determine timeframe for works.

Project Execution Plan

We can help you develop a fully functional PEP for use in your project or to standardise your companies framework for project execution.

Field Engineering Execution

Field Engineering assist with the completion of engineering, firming up the scope for Provisional Cost items and being the first reviewer of any Request For Information (RFI’s) raised by Sub-Contractors and/or Site Team.

Design Documentation

  • Assisting and liaison with Site Technical Document Control and Home Engineering Office
  • Monitoring, coordinating, and expediting design documents from the Home Engineering Office
  • Maintain a document deliverable matrix for document types

Engineering Change Management

  • Management of change to engineering by the Off-site Engineering Team
  • Management of change by the Sub-Contractor/Site team
  • Manage response to Request For Information (RFI) or Technical Queries (TQ)
  • Site Instructions where the change results in a change to a contract

Material, Equipment & Services Requisitioning

  • Material Receival & Inspection – Under, over or damaged reports
  • Vendor / Specialist attendance
  • Manage concession request

Quality

  • Assist Supervisory team to ensure quality of installation meets project requirements
  • Assist and/or manage Non-Conformance Reports (NCR).

Why PDI Forecasting

PDI Forecasting is an Excel JavaScript Add-In for progress measurement, forecasting, reporting and look-ahead programming and programme interface.

The UI has been designed to ensure the highest level of accuracy in forecasting, while minimising the overhead to setup and maintain.

PDI Forecasting seamlessly converts any excel list, register, or schedule into an industry-leading project controls application and manages change in the underlying documents.

RNM Professionals can set up your instance of PDI Forecasting, which is then used by your Project Team for recording progress and expenditure.

Once setup PDI Forecasting automatically and accurately forecast resources required to complete the project, produce look-ahead programmes, and provides detailed reports.

The accuracy of PDI Forecasting increases as the project progresses. This facilitates highly accurate forecasting in the critical stages of contract interfacing and project completion.


Check it out now

See links below to see how easy it is to setup and maintain PDI Forecasting on your project.

Contact

Interested in what we are doing or need more information?

Always happy to talk – just click on the link below and we will get back to you as soon as possible.

contact@rnmprofessionals.com

London, UK
+44 7428089960